COSTA NAVARINO

Project details

Project name4* AND 5* TOURIST COMPLEX “COSTA NAVARINO”
LocationGREECE, PERFECTURE OF MESSENIA, PILOS-ROMANOS
Surface4.500 m2
Construction time2007-2010
Budget€ 276.000.000,00
ClientAKTOR S.A.
ServicesDESIGN, SUPERVISION, COMMISSIONING
Χρόνος Υπηρεσιών2007-2010

 

Project description

INSTALLATION KEY CHARACTERISTICS 

  • Electric power: 10 MVA
  • Cooling load: 3.152 RT
  • Thermal load: 10.000 MW
  • Geothermal installation:
  • 2.820 KW cooling
  • Desalination installation:
  • 2.000 m3/day potable water
  • District heating and cooling
  • installation